How to find out how to make up for the lack of construction quality

Reconsideration site, which attention should be paid to the details of the connection? How should renovation projects of different projects progress? Here are a few tips for everyone to offer to help you sort out the key points for resuming work, and to avoid any minor mistakes after resuming work.

I. Prepare to review the budget

Decoration is a bottomless hole. The building materials with fashionable personality and rich colors on the market, such as sanitary ware, sanitary ware, and flooring, make you pick your eyes and emptied your wallet. You can take a few days before returning to work, and first calculate the decoration account: Is the item out of the budget? What kind of money is because of the heat of the mind? Carefully reviewing the current financial status of the family and rationally allocating funds for the subsequent renovation are very necessary preparations.

Reminder: The owner can negotiate with the project manager to negotiate the opening time three or four days in advance. It is better for the project manager, the worker, and the owner to unblock the reopening time. If it is agreed to return to work, the workers have not returned to Hangzhou on time. It is best not to urge or change workers. The construction habits or techniques of different workers are different, and the newly-replaced workers are not very clear about the project sequence, which will cause problems in the connection and affect the quality of the decoration. Try to make the connection work as detailed as possible to ensure the quality of the later project.

Second, the scene inventory items to confirm progress

After unsealing, we must first look at the construction site. Including water through electricity, check the use of water, electricity and gas, doors and windows are intact and finished product protection is appropriate. Second, we must check the on-site items. The items stored on the construction site during the shutdown period mainly include materials provided by the company, materials purchased by the owner, and tools for the worker's work. The last thing to do is to confirm the progress based on the records. The general schedule of the project progress bar is marked with “Start”, “Basic”, “Closed”, and “Completed” at the back of each type of work. The owner shall confirm the progress of the project based on the completion of the previous year and the project manager's introduction.

Reminder: Some home improvement companies provide a simple record form. Only materials are stored separately. Whether water, electricity, gas, doors, or windows are closed. Workers' work tools are recorded. There are no details on the names, models, and quantities of materials purchased. Describe that, the owner can note on the resumption form at the same time as the inventory, and be aware of it.

Third, the key construction quality check leaks

In the process of inventory verification, the inspection and repair of construction quality is of utmost importance. During the shutdown, no one was maintaining the site, and construction walls, light steel keel partitions, light steel keel ceilings, and wood products could all be deformed and moldy due to excessive moisture absorption. The decoration owner should carefully check the construction situation. If there is any problem, it should be promptly repaired to avoid leaving behind the “disease” and causing unnecessary losses. Because during the construction period, the costs incurred by the repairs may require the decoration company to bear.

However, according to the end of the hydropower reform, woodwork base, wall bricks, and wall, roof base layer processing, finishing and other stop-work nodes, the issues of attention when returning to work are also different.

Reminder 1: timely repair of deformed wood products

General renovation companies will rush to complete the hydropower reform before the suspension of work, leaving the carpentry work later. For some wood products that have already been produced, the workers will be required to perform a corresponding treatment, that is, a layer of seal primer is applied on the surface of the wood products. This layer is called “top coat” paint and can not only protect the wood products, but also It plays a role in isolating moisture, maintaining the normal moisture content of wood, avoiding deformation of wood products due to temperature and humidity changes during downtime, and contributing to the exposure of invisible problems. Therefore, on the site of woodwork that has been or has been completed before, it is necessary to see if the wood products are deformed or cracked due to expansion and contraction, and if so, the effect of remedial repair will be better.

Reminder 2: Smooth cracks in cracked walls

During the shutdown, it is necessary to thoroughly investigate the cracks in the cracked walls and roofs. According to the normal construction, the wall is usually 3 to 5 days apart from scraping, drying, sanding, and latex paint. However, due to the downtime, the wall may have been air-dried for too long and cracking may occur. Another is that if the wall is leveled, if the paint is not dry due to the deadline, there will be large-scale cracks on the wall after resumption of work, and the 15-20 days of downtime will just be conducive to thoroughly drying the grass. , Painting after stopping work will greatly reduce the annoying problems such as cracking and emptying.

Reminder 3: Coordinate Good Project Finishing and Installation

Most owners will strive to complete basic construction projects such as hydropower, woodwork, and paint before the suspension of work, leaving only the installation of sanitary ware, lamps, and hardware. For closing projects, it is very important to purchase materials and verify their delivery time. Because the lack of materials or materials cannot be present in time, it will result in an extension of the construction period and cannot be accommodated in time.

Link: Decoration construction must know six standard check hidden works

Construction Acceptance Paint Window Latex Paints Home Decor Home Decorations Budget Forms Decorations Find Decorations Companies How Do You Decrease Blocks Floor Tiles Tiles Tiles Tiles Tiles Floor Tiles Ld Tiles

Stress Analysis Gauges

Stress Analysis Gauges,Axial Strain And Stress Changes,Strain Gauge Type Sensor,Cb Series Strain Gauge

Zhejiang Nanhua Electronic Technology Co., Ltd , https://www.nhloadcell.com