1. Select the wall stone before paving, and pre-paste according to the design requirements. 2. Stones with lower strength or thinner should be attached with fiberglass mesh on the back. 3. When using the wet operation method, the steel mesh of the fixed stone should be firmly connected with the embedded parts. The joint between each stone and the steel mesh should be no less than 4. The wire for pulling should have anti-rust performance (usually used) Copper wire or stainless steel wire), before the mortar is poured, the stone back and the base layer should be wetted, and the joint material should be used to temporarily close the stone plate joint to avoid leakage. The mortar should be treated with 1:2.5 cement mortar. The layering should be carried out during perfusion. The filling of each layer should be 150-200mm, and it should not exceed 1/3 of the height of the board. The transplanting should be dense. After the initial setting, the upper layer of cement mortar can be poured. . 4, the wet stone before the paving should be painted with stone protective agent. 5. When using the bonding method, the base treatment should be flat but should not be calendered. The ratio of the adhesive should meet the requirements of the product specification. The glue is evenly and fullly brushed on the back of the base layer and the stone. The stone should be accurate when it is in place, and should be squeezed, leveled, and corrected immediately, and the top card should be fixed. The overflow should be removed at any time. Concerned about surprises Label: Home improvement construction: main points of wall stone paving construction Previous: Toilet water pipe purchase guide Next: When purchasing hardware locks, you should pay attention to 6 major elements Pesonal Care Cases,Protective Hard Shell Tool Case,Electric Razor Shaver Eva Case,Travel Organizer Eva Case Dongguan C.Y. RedApple Industrial Limited , https://www.hpgbags.com
Home improvement construction: main points of wall stone paving construction