Renovation: Matters needing attention in the decoration after heating

For home decoration, there are changes in the indoor temperature and humidity before and after heating, so the decoration details will also be different. Only by distinguishing can we make the decoration after entering the heating season easier and reduce hidden dangers.


Scholarly door parquet

Flooring: It is recommended to slowly warm up

After the heating, the floor can be normally laid, but the manager of the Yuen Chien-Ying store, said Zhang Sheng, said that in order to prevent the deformation of the wooden floor, the conditional households should be able to slowly raise the room temperature at the beginning of heating, starting from 15°C and increasing by 5°C per day. Finally, it reaches about 25°C.

In addition, after the start of heating, the interior is relatively dry. When the worker lays wooden flooring, remember to leave about 2 mm of expansion joints, otherwise drums, levitation, etc. will easily occur in the future.

If there is a phenomenon of leakage of heat, water on the wooden floor, etc., it must be wiped dry in time, and it must not be exposed to direct sunlight or baked in an electric oven, so as to avoid excessive drying and cracking of the floor. In order to prevent deformation, the floor on both sides of the wall can be dismantled, and the moisture can be dispersed before reinstalling.

Tile work: tile soaked in water and then posted

Some families use tiles that are laid in the winter. After a certain period of use, they are particularly prone to emptying and falling off. Du Xiaojun, who supervised the decoration of the canoe, suggested that before laying the tiles, the tiles must be soaked in water for a while to allow the water to reach saturation before resurfacing. He also said that after the paving, it should be done in a timely manner to avoid sticking to the cement due to the suction of water, resulting in weak adhesion to the cement. Finally, we must pay attention to the relative circulation of air, especially in the special space such as the kitchen and bathroom.

In addition, if ground heating is used, it is best to turn off the ground before laying tiles on the ground, because if the ground temperature is too high, the reaction speed of the cement mortar will be affected, and the solidification quality will be affected, making it easy. Caused brick arching and other phenomena.

Oil industry: pay attention to construction temperature

In general, if the temperature of the construction site is lower than 5°C, painting of the paint cannot be performed, but the room temperature after heating will not be lower than 5°C, so it will not affect the quality of the oil work. In addition, under conditions of sufficient temperature in the room during the winter, the paint and paint drying time is greatly shortened, which can reduce the intrusion of dust and ensure the surface color quality of the paint coating is excellent.

It is also worth noting that, as far as possible, wind-free weather should be selected for the oil industry, in order to prevent dust and sand from falling on the undried paint surface. Close the doors and windows during construction. At the same time, it should be applied strictly according to the temperature in the product description. The ambient temperature of the paint should not be lower than 5°C, and the ambient temperature when the varnish is applied should not be lower than 8°C.

Wood work industry: adapting to temperature before construction

After heating, there are differences in indoor and outdoor temperatures and humidity, and the plates will be affected when they enter the market. If used immediately, the finished wood product is easily deformed. Therefore, after the consumer buys the plate, it must be placed in the room for a few days, so that the temperature and humidity inside the house can be adapted to the water content of the plate itself before use. However, do not stack the decoration materials on the heating equipment to prevent it from being deformed due to uneven heating. In a geothermally heated room, wood and artificial boards are to be stacked on the bottom of the board to prevent cracking and deformation of the wood.

In addition, people in the industry have warned that some wood furniture and wood materials that need to be produced in the field must be tested for moisture content before construction. Wood moisture content should be controlled below 12% to ensure suitable shrinkage, which will be able to control the future deformation, shrinkage and other issues within the minimum range. After heating, the room temperature rises, the wood moisture evaporates, and the woodware made of a wood with a suitable moisture content has a low probability of deformation, and a water content that is too high may be deformed. At the same time, if the moisture content of wood is high, it must be naturally air-dried in the room, and it must not be close to the heating or the window or the door to air dry. Otherwise, the water loss due to excessive fastness will be easily deformed and cracked.

Notices Del Floor Natural Floor Heating Paint Coating Interior Decor Heating Flooring Tile Floor Tiles Kitchen Tiles

Bath & Shower Faucet

Both the bathtub faucet and the shower faucet are Bathroom Faucets, and the bathtub faucet is used with the bathtub. The shower faucet is used in the shower room. Products with different functions have different styles. Bathtub faucets include split bathtub faucets, wall-mounted bathtub faucets and floor-standing bathtub faucets.
The shower faucet has wall-mounted concealed shower faucet and wall-mounted exposed shower faucet, style, material, color, packaging, LOGO can all be OEM & ODM

more products: Brass Faucet,Bathtub Waterfall Faucet,Basin Faucet, Black Single Hole Basin Faucet,Brass Kitchen Faucet

Welcome your consultation and cooperation

bath shower faucet black,bath shower faucet set,tub shower faucet brass,bath shower mixer faucet,bath shower water faucet

Wenzhou Honglian Sanitary ware Co.,Ltd , https://www.hl-faucet.com