Acceptance of "hidden projects" is usually carried out during the first half of the project, timely acceptance of the "hidden project" in order to find the problem in the shortest possible time, and timely change the wrong method of construction, so that it will not be the overall renovation project Have an impact. The following "hidden projects" need to be carefully examined: >>>Links: Hidden Projects: Detailed Construction of Ceiling Construction First, the ground structure of the toilet should be at the lowest point where the sewers are fluent and there is no water seepage in the toilet. Second, check whether the water supply pipe is leaking, whether the floor drainage is smooth, and whether the waterproof layer is waterproof. Third, whether the wood keel and hanger rods in the ceiling are coated with fireproof paint, and whether the pipelines in the ceiling are firmly fixed or not. Fourth, in the wire and cable project, whether PVC pipe connections are tight and whether PVC pipes or sheathed wires are buried. Fifth, in the floor project, whether the cement screed on the ground is qualified or not, and whether the wooden keel of solid wood flooring is firm and whether it is to be fire-proof and moisture-proof. Sixth, in the partition project, whether noise insulation material is placed in the light steel keel partition wall. Hidden Engineering Cement Coatings Bidet Faucet (Brass) Wenzhou Honglian Sanitary ware Co.,Ltd , https://www.hl-faucet.com
Hidden project acceptance details