The most complete cabinet installation and acceptance of 19 items no longer have to worry about missing details

The quality of the cabinet installation directly affects the aesthetics and service life of the cabinet. How to check the installation effect of the cabinet. How to clean and maintain the cabinet after installation? Let's take a look at it today.

19 details of cabinet installation acceptance

Prepare for work

1, kitchen appliances are best about delivery, installation. Need to install the hood, stove, disinfection cabinet, the large pieces, when the cabinet began to install, the industry mainly agreed in advance of the kitchen delivery, installation time, it is best to also enter the market.

Small reminder: Maybe the cabinet designer will tell you, just go to the mall and copy the size of the home appliance you want to buy. When you make the cabinet, you will reserve a good position. You can buy it directly after you buy it, but the expert recommends it is still installed. When the cabinets are installed, they are in place. First of all, the home appliances are updated very quickly. It is possible to measure the size of the electrical appliances at that time. After the renovation, there may not be any goods. The reserved space can no longer be adjusted. Secondly, the kitchen appliances are installed together with the cabinets. The overall effect is adjusted to ensure the best integration.

2. Carefully clean the kitchen floor and corners beforehand. After the cabinets are installed, many corners will not be cleaned anymore. Although the workers will clean them before installation, they are not as good as the ones they cleaned.

How to check the cabinet

3, flatness

The floor cabinet should be shaken to see if it is firm before the countertop is installed. After installation, use a level gauge to measure whether the row of cabinets is level.

4, edge banding

The sealing edge of the high quality cabinet is smooth, smooth and feels good. The sealing line is straight and the joint is fine. The big brand uses edge banding machine to complete the steps of edge sealing, broken head, trimming, chamfering and polishing. The glue is evenly applied, and the pressure of the sealing edge is stable, ensuring the most accurate size. The small workshops are artificially glued, pressed, sealed, and polished. Due to uneven pressure, the sealing of many places is not strong, and harmful gases in the plates are volatilized into the air.

5, waterproof aluminum foil

The bottom plate of the cabinet with the sink should be covered with a whole piece of waterproof aluminum foil, and the three sides should be turned up 1cm to prevent the condensate from the sink or pipe from eroding the cabinet.

How to accept the door panel

6, color

Check that the color and material of the door panel are the same as those ordered. It is normal for the door panel and the color-matching card to have a slight color difference, but the overall color of the finished door panel is not allowed to have chromatic aberration.

7, front and back

Check the front and back surfaces of the door panel one by one for deformation, scratches, blistering, etc.

8, the door seam

The door joints should be uniform up and down, the width should be even, and the width of the door joint should be between 1-2mm.

How to accept the countertop

9, flatness

After the countertop is installed, be sure to check the flatness again with a level gauge.

10, seams

If the countertop is installed, the glue line of the seam can be clearly seen, or the hand can feel the obvious staggered seam, indicating that the seam is definitely not done.

11, color difference

Artificial stone of the same model color will have a certain degree of chromatic aberration due to different factory time. Everyone must pay attention to the comparison when entering the table.

12, open the hole

The position of the sink and the cooker on the countertop needs to be opened. The edge of the opening should be round and not jagged; the four corners must have a certain curvature, which cannot be a simple right angle, and must be specially reinforced.

13, after the water

In order to prevent the water from the countertop from flowing behind the cabinet, the place where the countertop is against the wall must be turned up to form a water retaining. It should be noted that this upturn must have a smooth arc upturn, but not a right angle upturn, otherwise it will leave a dead corner that is difficult to clean.

14, glue

The place where the back water is connected to the wall will be covered with white glass glue; the place where the table top is connected to the sink will be covered with transparent glass glue. Before you glue, you must check whether the glass plastic outer packaging is marked with anti-mildew function. After the glue is applied, the worker must be urged to clean the excess glue in time.

How to accept the hardware

15, assembling the eyelet

It is necessary to see if the holes on a board are evenly spaced and cannot be misplaced. The fit and precision of the hole position will affect the structural robustness of the cabinet. The professional manufacturer uses multiple rows of drills to complete a hole in the side of the board and the board, while the small brand is hand-punched on site.

16, drawer slides

Need to pay attention to check the drawer and pull-out basket, the shelf installation is stable and smooth, the drawer gap is uniform, should be smooth, silent, light, soft rebound.

17, the hinge

The hinge is an important hardware in the cabinet. The good quality of the hinge steel is good in thickness, flexibility and corrosion resistance. The base is high, the arm is long, and the positioning is free of displacement. It is easy to open and close without noise during use. Check if the handle is level, whether it is shaking or not, and the door panel should be switched without collision.

Construction services should be in place

18, finished product protection

Cabinets are generally at the end of the renovation. Workers should effectively protect the kitchen equipment such as gas meters and finished products such as tiles.

19. Cleaning the construction site

When grinding the countertop and the cabinet, a lot of dust and sawdust will be generated. After the installation, in addition to cleaning the dust on the floor and the cabinet, the dust in the cabinet should be cleaned. Finally, the site is cleaned, the package is collected and left after the construction. Rubbish.

[Scan the QR code below, pay attention to the WeChat public number "Jiuzheng cabinet network "; you can view the popular article " Why are acquaintances not buying your cabinet?" 》 , want to communicate with peers can join the Jiuzheng building materials network cabinet exchange group]

Constant Temperature And Humidity Test Chamber

An environmental test chamber artificially replicates conditions which machinery, materials, devices or components might be exposed to. It is also used to accelerate the effects of exposure to the environment, sometimes at conditions not actually expected.

Chamber testing involves testing and exposing products to various environmental conditions in a controlled setting. Climatic Chamber testing and Thermal Shock testing are part of chamber testing. Climatic Chamber testing is a broad category of ways to simulate climate or excessive ambient conditions exposure for a product or a material under laboratory-controlled yet accelerated conditions. On the other hand, Thermal Shock testing is used to simulate how materials will react when exposed to changes in extreme climatic conditions, such as going from extremely cold to extremely hot conditions in a very short period of time (usually only few seconds).

temperature and humidity chamber, climate chamber, constant temperature and humidity test chamber, humidity test chamber

Dongguan Best Instrument Technology Co., Ltd , https://www.dgbestinstrument.com